
The Tricel Novo UK12 sewage treatment plant is an aeration unit which is suitable for domestic and light commercial or communal applications.
Each system comprises of 3 independent treatment zones, all fulfilling a different stage of the purification process:
Stage 1: Primary settlement chamber
Stage 1 of sewage treatment is where the anaerobic breakdown takes place. The wastewater is introduced and the solids fall to the bottom of the primary settlement chamber, becoming separated from the liquid.
Stage 2: Aeration chamber
Stage 2 of the wastewater treatment involves aerobic breakdown. The aeration chamber is where natural bacteria live in the filter media.
The bacteria is kept alive by the air produced by the air compressor. As the liquid flows slowly through the filter media, the bacteria feed on the waste and remove it from the liquid.
Stage 3: Final settlement chamber
In the third and final stage of wastewater treatment is when the liquid flows from the aeration chamber into the final settlement chamber. The sludge, consisting of bacteria, is carried with the liquid into the settlement chamber and settles to the bottom of the chamber.
Tricel sewage treatment plants are reliable, easy to install and simple to maintain.
Model |
NOVO UK12 |
No. of People |
4-12 |
Length (mm) |
3600 |
Width (mm) |
1640 |
Height (mm) |
2270 |
Nominal Inlet / Outlet Diameter (mm) |
110 |
Weight (empty) Kg |
400 |
Inlet Invert To Base (mm) |
1375 |
Outlet Invert To Base (mm) |
1300 |
Inlet Invert To Ground Level (mm) |
535 |
Air Blower Rating (watts) |
100 |
Warranty Blower / Tank Structure (years) |
3 / 20 |
BOD5 (mg/l) |
11 |
SS (mg/l) |
16 |
NH4-N (mg/l) |
8 |
Offloading is the responsibility of the customer.
Delivery to some UK postcodes may incur an additional charge. Please contact us on 0333 335 5137 or sales@mrswastewater.com for more information
CONTACT US ON 0333 335 5137 TO FIND OUT ABOUT OUR TRICEL SEWAGE TREATMENT PLANT INSTALLATION SERVICES!